Lakewood Property Owners Association New Aquatic P

  • Site work has begun.
  • Building pad almost complete.
  • Footings and reinforcing steel set in place.
  • Footing poured and weather protected.
  • All underground utilities are installed ready for concrete floor slab to be poured.
  • Floor slabs installed.
  • Temporary tent structure installed for inside work.
  • Concrete Block walls going up under the "big top".
  • Masonry walls almost complete
  • Structural steel columns set in place.
  • Structural deck in place.
  • Stone work complete on the columns.
  • Stone veneer complete on the building exterior.
  • Glue laminated beams going up.
  • Roof framing being placed.
  • Vertical laminated wood framing going up.
  • All lower beams in place.
  • Roof framing progressing forward.
  • Roof Structure completed.
  • "Big Ass" fan installed.

Location: Lee's Summit, Missouri

Completed: May 2017

A new aquatic pavilion for The Lakewood Property Owners Association, comprising restrooms a snack bar, offices and covered seating.