Woodend Business Park

  • Foundations installed and setting up to pour the floor slab.
  • all underground utilities in place ready for the floor slab.
  • Under slab gravel being placed.
  • Gravel sub-grade installed ready for the concrete floor slab.
  • Concrete floor slab almost complete.
  • Steel is delivered and ready for erection.
  • Steel going up.
  • Exterior wall panels being installed.
  • South elevation facade taking shape.
  • Stone veneer backing in place.
  • Facade improvements nearing completion.
  • Completed project.

Location: Edwardsville, Kansas

Completed: June 2017

A 15,000 sq.ft. building addition for a local developer group. This building is being constructed for manufacturing and light distribution.